Grinders new headers!

Well so far he's running the iron 1brl till he get a 4 brl carb and or kick down cable, thing is he's going 4spd so he might wait till the sticks in.

We talked about drilling the side bosses to install some brackets kinda like the A/C uses but long enough, or even something that comes off of the water pump and bolts on the front would work.

Also going with sb oil pan arp stud kit to hold it all together.

ARP sb pan stud kit is the way to go with a slant.