A-bodies.......Big motors
.......CLEAN..................................
My new one coming out of the acid dipping bath........then it was trucked to Indianapolis to be totally dipped (E-coated) in electrostatic primer. All chassis work (rear frame rails, subframe ties, trans hump and overdrive tunnel, wheel tubs and rear floors/bulkheads) were done
before this...........
Rear wheelwells are already stretched 3" (in length) here............