88 Dakota drag project

-
Shifter is installed and working well. Tach is in. Oil pressure gauge hooked up. Throttle cable is in and hooked up. Bolted the seat down.
 
It will be awhile yet…looking like I will have to build some headers for now. Was planning to use the manifolds temporarily but they don’t clear on either side. Need to order a line lock solenoid, plumb the brakes. Trying to build this as cheap as possible, so I’m slow to order parts…
 
-
Back
Top