    I’m looking at having some concrete work done but I don’t know what would be a reasonable price. I’m looking at having a pad poured about 24ft x 30ft and either 4in or 6in thick. What do you guys think would be a decent price to pay for something like this?

    Thanks.
     
  2. 4spdragtop

    4spdragtop FABO Gold Member FABO Gold Member

    Messages:
    25,915
    Likes Received:
    5353
    Joined:
    Aug 28, 2009
    Location:
    Ontario
    Local Time:
    7:07 PM
    You paying for for just concrete? I paid $800 10 years ago for approx 750 cubic feet.
     
  3. Evan Dutch

    Evan Dutch Well-Known Member

    Messages:
    554
    Likes Received:
    147
    Joined:
    May 11, 2016
    Location:
    monroe north carolina
    Local Time:
    8:07 PM
    Oh no. The concrete and all the work entailed to have the pad poured
     
  4. 4spdragtop

    4spdragtop FABO Gold Member FABO Gold Member

    Messages:
    25,915
    Likes Received:
    5353
    Joined:
    Aug 28, 2009
    Location:
    Ontario
    Local Time:
    7:07 PM
    Dad n I excavated and formed/prepped.
    Approx $1300 in concrete and finishing. 3 or 4 crosscuts a couple days later. This was approx 10-12 years ago up here.
     
    • Thanks! Thanks! x 1
    • Ddaddy

      Ddaddy I'm changing the World... one pixel at a time! FABO Gold Member

      Messages:
      18,180
      Likes Received:
      20802
      Joined:
      Nov 7, 2015
      Location:
      SW of Philly PA
      Local Time:
      8:07 PM
      Plan on $8-12 per square foot and you will be close. Your pad area is 720 sq. ft. So figure around $8k with all the work of prep, base, forms etc.

      I just did 750 sq. ft. of pavers and it was $12k. Pavers cost about 50% more than just straight concrete.
       
    • Evan Dutch

      Evan Dutch Well-Known Member

      Messages:
      554
      Likes Received:
      147
      Joined:
      May 11, 2016
      Location:
      monroe north carolina
      Local Time:
      8:07 PM
      Wow. The building I’m looking to put on it is only $10k I wasn’t aware it costs that much
       
      • Like Like x 1
      • Ddaddy

        Ddaddy I'm changing the World... one pixel at a time! FABO Gold Member

        Messages:
        18,180
        Likes Received:
        20802
        Joined:
        Nov 7, 2015
        Location:
        SW of Philly PA
        Local Time:
        8:07 PM
        It depends on the prices in your area and how much prep and form work is required. It could be half of that if everything works in your favor. Get some quotes.
         
        • Like Like x 1
        • Agree Agree x 1
        • 67/6barracuda

          67/6barracuda Well-Known Member

          Messages:
          394
          Likes Received:
          304
          Joined:
          Jun 24, 2013
          Location:
          Sharpsburg, GA
          Local Time:
          7:07 PM
          $125.00 a cubic yard delivered 6 yd minimum. Seems to be average in these days. 24x30x.5=360/27=13.3cy 13.3x125= $1,666.67 this is without call outs for footers or Ramps.
           
          • Like Like x 2
          • Agree Agree x 1
          • Ddaddy

            Ddaddy I'm changing the World... one pixel at a time! FABO Gold Member

            Messages:
            18,180
            Likes Received:
            20802
            Joined:
            Nov 7, 2015
            Location:
            SW of Philly PA
            Local Time:
            8:07 PM
            That’s just the raw materials. Add in prep work, base, forms, etc and it is easily 3-4x that unless you do it yourself. If footers for the building are required, maybe a bit more.
             
          • Evan Dutch

            Evan Dutch Well-Known Member

            Messages:
            554
            Likes Received:
            147
            Joined:
            May 11, 2016
            Location:
            monroe north carolina
            Local Time:
            8:07 PM
            I won’t be using footers or ramps. I know I’ll have to have dirt brought in, the site has quite the slope. I know I’ll have at least one guy come out this week for a quote
             
          • 67/6barracuda

            67/6barracuda Well-Known Member

            Messages:
            394
            Likes Received:
            304
            Joined:
            Jun 24, 2013
            Location:
            Sharpsburg, GA
            Local Time:
            7:07 PM
            Yes this is a bare minimum for concrete I always try to add 10% waste factor as well. It’s all situational dependent you must of course account for your form work, aggregate, WWF or rebar, high chairs, plastic, expansion joints. I assumed he was doing the work himself. Hopefully, he has access for delivery of a standard truck and doesn’t need a pump truck.
             
          • Evan Dutch

            Evan Dutch Well-Known Member

            Messages:
            554
            Likes Received:
            147
            Joined:
            May 11, 2016
            Location:
            monroe north carolina
            Local Time:
            8:07 PM
            I’ve thought about having it pumped. Not a lot of access for a truck to the site. But it is quite expensive.
             
          • cosgig

            cosgig MoBro Inc. FABO Gold Member

            Messages:
            11,003
            Likes Received:
            3679
            Joined:
            Jul 20, 2008
            Location:
            Pinckney, Michigan
            Local Time:
            7:07 PM
            Just helped do my neighbors driveway addition...11’x44’, $3k finished.
             
          • Ddaddy

            Ddaddy I'm changing the World... one pixel at a time! FABO Gold Member

            Messages:
            18,180
            Likes Received:
            20802
            Joined:
            Nov 7, 2015
            Location:
            SW of Philly PA
            Local Time:
            8:07 PM
            480 sq. ft, OP has 1.5x that...$4500 doing some of the work himself. The numbers are consistent.
             
          • spl440

            spl440 Everybody's Fool FABO Gold Member

            Messages:
            1,390
            Likes Received:
            1443
            Joined:
            Feb 2, 2011
            Location:
            Hot Springs AR
            Local Time:
            7:07 PM
            If having dirt added because of slope, make sure of good compaction, other wise cracking will occur. Also, after fill and compacted, it is a good idea to wait for settling, even after compaction, some say up to a year for best results. It is best to pour onto virgin ground, can scrape off a layer, but be careful of adding fill to level.
             
            • Agree Agree x 3
            • norshorblufish

              norshorblufish By the Big Water

              Messages:
              2,049
              Likes Received:
              236
              Joined:
              Dec 1, 2007
              Location:
              Duluth, Minnesota
              Local Time:
              7:07 PM
              I agree with Ddaddy in post #7
              Get some estimates.
              The cost of concrete and labor is different from area to area and contractor to contractor.
              What we tell you could be way off from where you are.
              Could be more or less.
              You could multiply the length by width by thickness of the slab
              That will give you the cubic footage then divide by 27 that will give you the cubic yards.
              Then call the concrete company to check the cost per yard of concrete.That might give you a better idea.
               
              • Thanks! Thanks! x 1
              • cosgig

                cosgig MoBro Inc. FABO Gold Member

                Messages:
                11,003
                Likes Received:
                3679
                Joined:
                Jul 20, 2008
                Location:
                Pinckney, Michigan
                Local Time:
                7:07 PM
                The guy that does our concrete work compacts every 3” of fill. He does government work at the Air Force base and that is their requirement. You can literally drive the bobcat on the compacted sand and not leave tracks. He is very meticulous about every step of the job, and his 80 yr old Dad helps him, he has been in the business for over 60 years. They are a mule team for sure. They also insist on 12” block for every job, and laboring for them on jobs exemplifies the word “labor”.
                 
                • Like Like x 1
                • 512Stroker

                  512Stroker We are all here because we are not all there.

                  Messages:
                  537
                  Likes Received:
                  217
                  Joined:
                  May 30, 2016
                  Location:
                  Freedom, MO
                  Local Time:
                  7:07 PM
                  Ahhh?
                  No footings and a slope.
                  Dude you need to talk to someone in your area that does concrete for a living. Not your neighbors slack jawed cousin.
                  Buildings that set on top of a concrete slab need structural support, ie footers.
                  You dont want to spend the money and end up with a piece of crap.
                  I have built several shop and storage buildings, do it right or dont do it.
                   
                • RustyRatRod

                  RustyRatRod 30 Degrees Outta Whack FABO Gold Member

                  Messages:
                  52,021
                  Likes Received:
                  19368
                  Joined:
                  Jun 7, 2010
                  Location:
                  Georgia
                  Local Time:
                  8:07 PM
                  A basic pad is a simple procedure. Kitty and I did the last bit I had added on before I put the shop up and our section is every bit as good and smooth as the contractor that did the first part. You can work wonders with a 2x4.
                   
                • Krooser

                  Krooser Reform School Graduate

                  Messages:
                  1,292
                  Likes Received:
                  963
                  Joined:
                  Jul 19, 2015
                  Location:
                  Land of Cheese
                  Local Time:
                  7:07 PM
                  I worked on a concrete crew for a summer in '69. So I had a bit of experience.

                  My 1500 sq. ft. shop floor cost $2K when I had it done in '94.

                  Years later I wanted a parking pad and a driveway poured in front of my shop.

                  I borrowed some forms and set them up myself. My son was working construction so I got him and three buddies to do the pour and finish work for lunch and a case of beer. Two 30x30x4" pads for $800.00... was the only way I could afford to do it.
                   
                • Evan Dutch

                  Evan Dutch Well-Known Member

                  Messages:
                  554
                  Likes Received:
                  147
                  Joined:
                  May 11, 2016
                  Location:
                  monroe north carolina
                  Local Time:
                  8:07 PM
                  Manufacturing of the building does not require footers
                   
                • 512Stroker

                  512Stroker We are all here because we are not all there.

                  Messages:
                  537
                  Likes Received:
                  217
                  Joined:
                  May 30, 2016
                  Location:
                  Freedom, MO
                  Local Time:
                  7:07 PM
                  Is it a pole building?
                   
                • Evan Dutch

                  Evan Dutch Well-Known Member

                  Messages:
                  554
                  Likes Received:
                  147
                  Joined:
                  May 11, 2016
                  Location:
                  monroe north carolina
                  Local Time:
                  8:07 PM
                  It’s a prefabricated steel building. Uses 2.5”x2.5” 12ga steel as the framing
                   
                • 512Stroker

                  512Stroker We are all here because we are not all there.

                  Messages:
                  537
                  Likes Received:
                  217
                  Joined:
                  May 30, 2016
                  Location:
                  Freedom, MO
                  Local Time:
                  7:07 PM
                  That sounds like alot of weight to sit on a slab without footings.
                  I am not familiar with that type of construction.
                  Good luck with your project
                   
                • 44070dart

                  44070dart How the hell did I get this old

                  Messages:
                  784
                  Likes Received:
                  525
                  Joined:
                  Jul 9, 2004
                  Location:
                  right here ...see me I'm waving
                  Local Time:
                  1:07 AM
                  320 sq. ft. patio, 4".. $3000 2 years ago
                   