More stuff done!
1. Door hinges and gaskets replaced.
2. Driver and passenger windows sealed.
3. Engine wired.
4. Disk brakes converted.
5. Ride height and shocks in place.
Hey everyone. Can I get some pics of everyone’s exhaust setup? Is everyone running and X pipe or a crossover of some sort? Is an X or Y needed on the newer hemis?
Thanks!
I have some more progress to share!!
Got all the brake lines in, 4 wheel disk. Also the offset master cylinder
POR15 the entire floor(just as a precaution) only had to replace the pass. side floor pan.
Painted the roll bar black.
Cleaned and sealed the engine bay with a silver color.
I guess I never shared this video. This is one of the best runs this motor has done. 12.25sec 1/4mile..... In a fully trimmed Crew Cab Ram with a Curb weight close to 5500lbs.
Man that Bouchellon piece is expensive... Randy seems like a nice guy and was helpful over the phone. I didn't order it yet because he has to check the fitment for the vvt truck timing cover.