So...I was wrong. I just checked the car,185/75-15 mh racemaster radials on streetlite 4". Mounted is 25-3/4" and 26" with no load at 32psi scaled at 1460# front
I missed all 3 of the events I enter up there this year. I was hoping to back up my last et there. I really like it up there. LBV and the people made Englishtown just ok.
If I read correctly, you were considering running the electric pump as suction from the water pump inlet to the bottom of the radiator. I was taught that radiators are hot top(inlet) and cool down(outlet) due to thermodynamics. Crossflows work the same, but I don't see how putting the "hot"...
Yes,over the plate. Just as if you had a motorplate like in the post#4 pic. The ports can be drilled and tapped to a desired size. No, the factory water pump doesn't have dividers. Yes a Y will work fine, the water will go where it can.
My max timing is 26 degrees, pretty much runs much of the rpm range at 22. Picked up 2 tenths. Naturally aspirated Gen 3's don't like or need a lot of timing. If you have a scanner or code reader that shows data stream, plug it into a late model hemi vehicle and note the actual timing while...
In the spirit of this^^^^^^^. These are the plates I was given by 76orangewagon . I was going to use a pump gasket as a template for the 3/8" block off plate. These would be drilled larger and tapped for 90 degree fittings. Mounted as pictured above and plumbed to a dual outlet pump. His install...
76orangewagon did this (20teens) and I asked him about the plate. He made two 1/2" thick adapter plates that could be tapped for coolant hose fittings and used them over the block off plate. I haven't seen him her in a while.
gps tach is an "add on". It'll allow you to pull up feedback 0-60,1/8.1/4,et's,mph and highest rpm reached) just as the gps speedo does with out changing the factory gauges. All the things you can do with a phone app. except rpm.
This was at least 100 hours from layout to run. I had went from FAST (408) to terminator x (hemi) back to FAST (Hemi). So even with experience , wanting a specific outcome wasn't free timewise (all labor was mine) it was about 100 hours each time.