10000 day calender

-

abodyfan

FABO Gold Member
FABO Gold Member
Joined
Aug 18, 2008
Messages
319
Reaction score
26
I was wondering how it works, when it starts. Trying to figure assembly date on an engine. Thanks for any help.
 
Good rule of thumb is 6 months from the casting date on the side of the block. MaMopar liked to let her blocks cool before machining and assembly.
 
A 10000 day calender sounds like what I will need document the restoration of my dart at the pace I've been going.
 
A 10000 day calender sounds like what I will need document the restoration of my dart at the pace I've been going.

Amen brother. Since I've had my duster I pulled my carpet out and towed it to 3 different places, lol!
 
July was the great change date

grumpuscreature has the rule of thumb I use.:read2:

And I am a July baby:drinkers:
 
I hear that 1967GTDart, it's all about the cash flow and mine is low at the moment. Forward motion though how ever slow is still forward motion.
 
Thanks for all the help. I will keep everything in mind.
 
-
Back
Top