Epoxy is waterproof urethane primers are not. Lots of different stuff out there, depending if it's specified as direct to metal or not. If not it will need some type of etch prime first.
 
so epoxy over bare steel,sand and regular primer from then on?
is epoxy hard to sand?
 
if you were to let the epoxy cure before later primer and bodywork, would
it be difficult to sand?
 
if you were to let the epoxy cure before later primer and bodywork, would
it be difficult to sand?

Suggest that bodywork be completed before prepping surface for prime and top coats.

Not aware of two-stage primer. Two stage paint, color & clear coat, I know about.
 
2k just means 2 part...if it was laquer primer it would be 1k and if it used primer, hardener and reducer it would be 3 k...2 stage means base/clear...if u had a pearl mid coat it would be 3 stage
 
-