Ceiling is going to be another challenge, as I’m putting up metal panels, and then insulating above that. Walls (poles and studs) aren’t perfectly straight, so haven’t figured out how I’m going to work through that and put-up the j-channels quite yet…..
But first things first. Tomorrow morning my wife and I are going to Menards, before it gets too hot, and loading up with 38 sheets of OSB, all to be used for the walls.
Sweat my *** off today (and I took it easy out there!), but slow and steady wins the race, as they say, and tomorrow is another day.