72 duster in progress

-
painted floor pans with eastwoods rust encapsulator and then with flat blck paint, for protection.
 
After wheel tubbs were welded in we bought a 4x8 sheet of 20 guage steel and cut it to fire proof the back where the seat goes because there will be a 15 gallon fuel cell, this was also added for strength there is a pinion snubber on the rear.
 

Attachments

getting ready for painting getting, picked up December 9, 2011
here is a few pics
 

Attachments

Just got a set of RHS heads from MRL performance with lunati solid camshaft and lunati solid lifters. just ordered a comp cams racing timing chain from summit racing.
 

Attachments

more pictures coming soon. the car was just sent out to get painted and as it gets painted i will upload more pictures.
 
-
Back
Top Bottom