Stop in for a cup of coffee

-
And another 77 to finish it! Like I should talk right?
haha well, i got laid off 3 months into it and thats when i started the tear down. Figured id find a job quickly, nope. Anyway, I said at that time I wanted it fully ready to do the 100th anniversary route 66 cruise, I've right about 6 years left to meet that goal. :rofl::rofl::rofl::rofl:


honestly, like I said in my build thread. Been pretty happy with the progress the last 4 months. finally getting the Dana finished and welded in is a HUGE step and this week, i'll continue stitch welding up the floor plans and trans tunnel. After that, it'll just be the trunk floor and tubs to do, all of which are made up and ready to go in. then i cut all the bracing out, primer it and start mocking up the interior. not quite seeing daylight at the end of the tunnel yet, but should soon
 
@Mopar Tim

211506592112_o.png?_nc_cat=109&_nc_sid=8024bb&_nc_ohc=1rdla3cEBLgAX9Xq8TJ&_nc_ht=scontent-lga3-1.png
 
Any one need or should I say a 30 lb can of r12? Stan has one for sale.
I think I lost most of what I put in the Duster. But probably switch it to 134 after I open it up and change seals (eventually). Not very high on the priorities this year. Haven't had the cover off since a week after Carlisle. Still haven't heard back from Xfinity's insurance after they scratched it either. :(
 
-
Back
Top