Bigdummy
Not a Nova
Well it was supposed to be built but the Texas heat got to them and they are behind.I got the loan payed down from 18,100 to 9,456 in 2 months.The contractor said give them 2 more weeks to get started.They have built several shops in my area.its gonna be Ash grey with a Stone gray trim ,insulated with a 16x10 door 12ft walls.Im gonna wire it.
http://www.millersmetalbuildings.com/index.html
http://www.millersmetalbuildings.com/index.html