While redoing dash harness on our 67 barracuda I added extra grounds. As I try and tidy this up i wanted to test led's and anything else before the dash goes in. I installed the extra grounds on existing ground posts on circuit boards. Is this a bad idea? Should I move off the existing circuit boards to the metal cluster housing?
I'm applying 6v and some light, some dont. I have tested out of sockets and they all work.
Also can I put a 12v charger on the new external ivr as my 12 v supply?
Thanks
Steve
I'm applying 6v and some light, some dont. I have tested out of sockets and they all work.
Also can I put a 12v charger on the new external ivr as my 12 v supply?
Thanks
Steve