MVRCorp
Well-Known Member
- Joined
- Nov 10, 2006
- Messages
- 1,723
- Reaction score
- 22
Just patched some concrete curbs at the office complex. I'm the "Building Engineer" (sounds like a bullshit name for the janitor). Anyway, how long should it cure before I can paint it with an oil base paint?
Thanks, Jim
Thanks, Jim