Stop in for a cup of coffee

-
I used one of those bagsters once, there is a pickup fee though.Does hold a lot of stuff, like a 4 x 8 bag around 2' high
 
It's a mess, shingles are so curled the tabs are falling off...I guess I could ju $t break the tabs off and lay over it, but was planning G to remove everything. 5hey used plastic underlay. Thought would run 15lb felt over that. OMR, will call you later. Going to my daughters concert in Princeton this afternoon. So probably around noon while driving...
 
I was thinking a metal roof over it, pretty easy to do if you can get away with it and actually cheaper.
 
I was thinking a metal roof over it, pretty easy to do if you can get away with it and actually cheaper.

I did metal on my shed. Think I want to stick with shingles on this. I know some do 2nd layer shingle, never did any that way. I think the uneven surface would lose years of life of new roof...
 
in ny the law was three layers max. Never did any myself, did steel twice.

Got me thinking now, going over it - would hardly have anything to get rid of. Save's a lot of time, a little money... if I clean off just the crinkled tabs, it should be flat enough. But the big plus is it doesn't matter if I get done all at once.
 
I'm waiting on two guys to call so I can meet them. They have to drop off a part for someone to pick up. They are coming from Michigan and are most of the way here. Should be getting close soon....
 
Up still partying with the spouse gone or just waking up? Either way good morning! By the way I am out of OJ!
 

-
Back
Top Bottom