Stop in for a cup of coffee

-
Pics upside down again.

20210812_072657~2.jpg
 
First appointment was a breeze. 2nd one is a belt adjustment and service. Day is done.
 
O it runs great out of the box. I haven't even turned mixture screws. Just set idle.
Just need to get at least 20 MPG or my whole build is a failure. For what I want to do with it. Power tour!!!
Power tour is in 2 weeks! You gonna make it?
 
O it runs great out of the box. I haven't even turned mixture screws. Just set idle.
Just need to get at least 20 MPG or my whole build is a failure. For what I want to do with it. Power tour!!!
Plus, with that Od, it should be easy for you to hit that
 
I do not think this new thermostat is opening.... Not much flow in radiator when it should be full open. Looks like just the bypass is flowing. Out it comes.....
 

Not getting much done this week. Had eye doc yesterday. Heat and humidity ugly. Getting ready to go away for the weekend
Got a good start on the shed floor a few days ago. Tore out almost all the junk, so I can see what I have to work with. Will change or sister a couple of the supports and get one new main across under middle of those and supported with blocks. Then can start putting the floor back together. Planning to re-do in 2 crossed layers as it was. Might actually take almost all of it out and reconfigure boards that are still good for base layer.

B0DE4AD7-7AFD-49DE-BB85-DE305607E1B4.jpeg
 
Last edited:
-
Back
Top Bottom