- Joined
- Mar 6, 2008
- Messages
- 933
- Reaction score
- 599
Yes, I have one of those drawn up and the circuit board already laid out. Testing will start once the '70 and later is in production.So you do have plans for the early A regulators?
Yes, I have one of those drawn up and the circuit board already laid out. Testing will start once the '70 and later is in production.So you do have plans for the early A regulators?
Will it matter that I'm using the later square back with the extra field grounded? I'm still using the early style voltage regulator.Yes, I have one of those drawn up and the circuit board already laid out. Testing will start once the '70 and later is in production.
To use Matt's '70 up you'll have to unground the field terminal, add a second wire, and splice in the VR Connector,Will it matter that I'm using the later square back with the extra field grounded? I'm still using the early style voltage regulator.
You withdrew your offer to test.I am pretty sure I told you I would be interested, or are my temperatures too hot for it
You won't have to wait long! I have almost all the items together to get these shipping.I'd like to buy one when they are available. 72 Swinger with the 2 field connector alt is not charging even with a new regulator. I read that new ones are garbage so that makes it even more difficult to troubleshoot. Here's my tale of woe.
72 Swinger not charging battery
Will you message me when I can buy one? They're "sold out" on the website.You won't have to wait long! I have almost all the items together to get these shipping.