LOL really? Legos wood working starter set!
Oh lord no, my son is a wiz building and framing, he don't need no stinking kitdid you buy that as a kit?

LOL really? Legos wood working starter set!

Thank you, I tell yea bro, this has been a 3 year wait and so glad I can move forward now..Looks great Mike!

they make thoseLOL really? Legos wood working starter set!
They merged with Lincoln Logs!they make those
I believe 8' apart with double gage boxes in each location, one outside weather proof and 2 220 plug in's one near the center door area and one on the back (east) wall, a 220 leg for compressor on the south was to your right.Mike how many electrical outlets you doing? I have mine every 8' apart around chest high to keep water and crap out of them and there still are not enough.
If it isn't to hard seriously think 4' apart you will not regret it especially above a bench.I believe 8' apart with double gage boxes in each location, one outside weather proof and 2 220 plug in's one near the center door area and one on the back (east) wall, a 220 leg for compressor on the south was to your right.
more...Not enough! Especially 220I believe 8' apart with double gage boxes in each location, one outside weather proof and 2 220 plug in's one near the center door area and one on the back (east) wall, a 220 leg for compressor on the south was to your right.
36X40, drive in 36 deep, 40 wideHow big is that again Memike?
pretty much the same size ive been looing at. been looking at either 32X40 or 40 X 4036X40, drive in 36 deep, 40 wide
on our big tractor shed, we have one inside by the door with a 25 foot cord and then one out side on the back side of the shed. but the outside one is mainly for the camper.I only have one 220 between the front doors for the welder but I did make up a 50' extension cord for it of 2 gauge.
single or 3 phase electric?I do agree, but a new car lift is going to be a number one priority, Creed has the shop set up to park the welder, Pipe bender in the same location, so each location will have double gage boxes of 220. one on the front wall one on the back wall.
Thaanks !! I will need one myself on the south wall (wall to the right) near the flat tree areaon our big tractor shed, we have one inside by the door with a 25 foot cord and then one out side on the back side of the shed. but the outside one is mainly for the camper.

Singlesingle or 3 phase electric?
With out labor concrete was $2.500, trusses was $2.000, labor bill for the finnishers was $$900.00 fill was $400.00 I am not sure what the 12 foot lumber cost, my son charged it to his building corp, I will get a total at the end Hop's Labor is free, my son helped his partner build his home soMike just curious to have a shell put up that size what does it cost there with labor and all? Just the shell.

Never heard of it. Details?
We're is it. Although I doubt it . Have to stay off the foot for at least two more weeks.
Nice mix of vehicles there for sure.At the Thomas Massey house on Lawrence Rd just south of the West Chester Pike.
The field fills up early. I just park on the street the more recent times I've gone. Then I can come and go when I feel like it. 'Entry' is food drive and toys for tots donations. So now if I bring canned goods to donate, I just hand it to 'em. About noon those who are interested go on a rally - I've always just headed out to whatever I have planned for the afternoon.
Its organized by one of the Penna antique car clubs. Basically just a bunch of people hanging out, drinking coffee, cider, eating donuts and shooting the breeze.
View attachment 1715110941
View attachment 1715110942
View attachment 1715110945