Ddaddy
Just doing what I do
Well, If you found one...you will find the other.Found one bag. 8. need 16. Crap......Other bag missing...![]()
At least you have one set to use to size replacements, just in case you don’t.
It’s just basic hardware.
Well, If you found one...you will find the other.Found one bag. 8. need 16. Crap......Other bag missing...![]()
Look the same as the tail light mounting studs....Just checked, those are too small...Well, If you found one...you will find the other.
At least you have one set to use to size replacements, just in case you don’t.
It’s just basic hardware.

My barracuda is in 4 buildings..just sayin.Look the same as the tail light mounting studs....Just checked, those are too small...
My dart is in 3.My barracuda is in 4 buildings..just sayin.
Mine is in 2 States!! Beat that!My dart is in 3.
Next time i place an order, technically mine will be in 2 countries. Lol. Now all we need is anders to chime in. Lol.Mine is in 2 States!! Beat that!
My new transmission it in PA.Next time i place an order, technically mine will be in 2 countries. Lol. Now all we need is anders to chime in. Lol.
Right, at Ray’s if i recall.My new transmission it in PA.
Mine is in a state of confusion, state of disarray and a state of panic. Maybe that works!Mine is in 2 States!! Beat that!
That’s what she said.Clean to start clean to finish
She was so wrong! It was dirty from the word go!That’s what she said.
Sounds like fun. So glad this work week is done for me. 4 Mondays was enough.Howdy all. 2 out of 4 generators down, 1 of the mains (2450KW) and 1 of the ships service (994KW). We are also late on the oil change on the other main. So waiting till wind is too high for crane ops to switch to 1 ships service so I can change oil in the main.
In order to run the 500 ton crane you need 2 ships service or 1 main. So between people touching and breaking stuff specifically labeled do not touch, yeh.....![]()